The first span of the new Goethals Bridge opened over the weekend. Kwik Bond is proud to be a part of this project with our Polyester Concrete Overlay! Click this link for a time lapse of the full construction Time Lapse

Transportation Research Board Annual Meeting 2016
Kwik Bond Polymers will be attending the TRB meeting January 10-14th. Please come by our booth in the exhibit hall, booth number 531.

San Mateo-Hayward Bridge Polyester Concrete Complete
The deck rehabilitation of the historic San Mateo-Hayward Bridge high rise section is complete after a full closure over the Memorial Day holiday weekend. The majority of the work required removal of the existing epoxy asphalt bridge deck overlay and replacement with a specialized version of Kwik Bond Polymer’s PPC1121 using a Zinc Primer on the orthotropic steel deck. http://abc7news.com/traffic/san-mateo-bridge-reopens-after-weekend-closure/740497/

Polyester Concrete at 2015 Design-Build in Transportation Conference 3/9 – 3/11
We will be attending the 2015 Design-Build in Transportation Conference in San Antonio, TX 3/9 – 3/11. Please come visit us in the exhibit hall to learn about Polyester Polymer Concrete bridge deck overlays!

Transportation Research Board Annual Meeting 2015
Kwik Bond Polymers will be attending the TRB meeting January 11-15th. Please come by our booth in the exhibit hall, booth number 315. Merritt Hanson, of Kwik Bond Polymers will also be presenting on the Deck Rehabilitation of Augustine Cutoff Bridge in Wilmington, Delaware, Using a Polymer Concrete Overlay with David Nizamoff,of Whitman, Requardt & Associates, LLC. This presentation will take place on Monday, January 12th in the AHD40 (Polymers) session at 3:45. For more information on the presentation please visit http://pressamp.trb.org/aminteractiveprogram/EventDetails.aspx?ID=31961

60 Minutes Highlights America’s Failing Infrastructure
Last week 60 Minutes on CBS featured a segment on the country’s failing infrastructure. See the video here. They clearly made the point that funding must be secured to repair and rebuild our nation’s bridges. We at KBP are part of the solution by offering cost effective preservation systems that extend the life of bridges while minimally impacting the travelling public. Please take a few minutes to watch the news report in the link above, and share it with anyone who may be interested in this critical and time sensitive issue.

Kwik Bond will attend the 2014 ABC Conference
Please come see us at booth 309 in Miami, 12/4-12/5, at the 2014 ABC Conference

Everyday Counts High Friction Surface Treatment FAQs
Another GREAT resource for all of your questions: https://www.fhwa.dot.gov/everydaycounts/edctwo/2012/pdfs/fhwa-cai-14-019_faqs_hfst_mar2014_508.pdf

High Friction Surface Treatment FAQs
See the link below so for some common Questions and Answers about HFST: http://www.atssa.com/Resources/HighFrictionSurfacing/FAQs.aspx

Kwik Bond will be attending the National Bridge Preservation Partnership Conference
We will be attending the National Bridge Preservation Partnership meeting 4/21-4/25 in Orlando, FL. Come see us at Booth 41!

Kwik Bond will attend the DBIA Conference in San Jose 3/19
We will be attending the Design Build in Transportation Conference 3/19-3/21 in San Jose, CA. Come see us at Booth 229!

New Eastern Span of the Bay Bridge scheduled to open 9/3
Check out the drive simulation video HERE! Kwik Bond’s Polyester Polymer Concrete overlay is on much of the new span. Also, check HERE to see videos of work happening over the closure this weekend – polyester concrete overlay at the Yerba Buena Tunnel as well as lots of other work.

Western Bridge Engineers Seminar 9/3
We will be attending the Western Bridge Preservation Partnership 9/3-9/5 in Bellvue, WA http://www.westernbridge.net/info.php

APWA Reporter: High Friction Surface Treatment Article
In the July 2013 issue of the APWA Reporter: High friction surface treatments: a cost-effective strategy that saves lives. View the article here

Check out what FHWA has to say about High Friction Surface Treatments (HFST)
As one of the Every Day Counts 2012 Initiatives… http://www.fhwa.dot.gov/everydaycounts/edctwo/2012/friction.cfm

Western Bridge Preservation Partnership 5/8
We will be attending the Western Bridge Preservation Partnership 5/8-5/10 in San Diego, CA. http://www.tsp2.org/bridge/wbpp/2013-2/

El Puente Newsletter – High Friction Surface Treatment
The El Puente Newsletter featured an article on High Friction Surface Treatment (HFST). Click on the link below to download and read. El Puente Newsletter Volume 27 Issue No 1

Design Build in Transportation 3/18
We will be attending the Design Build in Transportation Meeting 3/18-3/20 in Orlando, FL. http://www.dbia.org/conferences/transportation/2013/default

Transportation Research Board Annual Meeting 1/14
We will be attending the Transportation Research Board 92nd Annual Meeting 1/14-1/17 in Washington, D.C. Please visit us at booth numb 3705. http://www.trb.org/AnnualMeeting2013/AnnualMeeting2013.aspx

New Indian River Inlet Bridge weathers Sandy 10/29
http://www.latimes.com/news/nation/nationnow/la-na-nn-hurricane-sandy-delaware-bridge-20121030,0,4442347.story